Skip to content

Merge pull request #109 from bobbens/master #143

Merge pull request #109 from bobbens/master

Merge pull request #109 from bobbens/master #143

Triggered via push April 8, 2025 10:57
Status Failure
Total duration 47s
Artifacts

test.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.11)
Process completed with exit code 2.
build (3.9)
The job was canceled because "_3_11" failed.
build (3.9)
Process completed with exit code 2.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.